Public Consultation Website For

The LEB Building

Welcome

Welcome to our dedicated consultation website for the future of the former LEB building at 255 – 279 Cambridge Heath Road, E2 0EL.

Telford Living are exploring proposals for the redevelopment of the site. We are at an early stage in the process and are keen to hear from the local community to better understand their views on the site, as well as the needs and priorities of the wider area. This feedback will play a vital role in shaping the emerging proposals.

 

Application update

Our application been submitted to Tower Hamlets Council, which can now be found on the planning portal using the validation reference: PA/26/00212/A1.

You can access all consultation materials, as well as the key submission documents, by visiting the Consultation tab of this website.

 

LEB Spring Festival

Thank you to those who joined us on Saturday 18th April the LEB Spring Festival. Telford Living opened up the site of the former LEB Building to local charities, youth, arts and cultural and religious groups – and the wider community – for a free, family‑friendly afternoon of activities, creativity and food. It was a pleasure to enjoy the sunshine and day with you all!

Where to find the site

 

The Team:

Telford Living – Developer

Telford Living specialises in developing best-in-class homes and sustainable communities on premier sites in major cities across the UK. They are committed to building a robust pipeline of high-quality developments, including Build to Rent, Purpose-Built Student Accommodation (PBSA) and co-living.

With a current pipeline in excess of 2,500 units, Telford Living builds on the expertise and legacy of Telford Homes, which completed £3.25 billion in projects between 2000 and 2024.

AHMM – Architects

Winner of the RIBA Stirling Prize, Allford Hall Monaghan Morris
(AHMM) was established in 1989 and has offices in London, Bristol and Oklahoma City. AHMM makes buildings that are satisfying and enjoyable to use, beautiful to look at and easy to understand.

The practice designs very different buildings for very different people to use in very different ways, making places as well as buildings that work overtime and have lasting qualities intrinsic to their architecture.

DP9 – Planning Consultant

Established in 2004, DP9 is a leading independent, specialist planning consultancy based in London.

Their work is wide-ranging, and they are renowned for their involvement in delivering some of the most high-profile projects in and around London and the southeast.

Kanda Consulting – Engagement Consultant

Kanda specialises in working with community organisations, businesses and residents to ensure they have the opportunity to offer meaningful, early input into local developments.

 

If you have any questions or at this stage, please get in touch via the details below:

LEB@kandaconsulting.co.uk

020 3900 3676

The Site

The LEB building dates to the 1950s. It was originally the headquarters for the London Electricity Board and later use by the Council as office space. The building is currently being used ‘Proposition Studios’ who are an affordable workspace provider specialising in artists’ studios.

While currently occupied by Proposition Studios on a temporary ‘meanwhile use’ basis, the building’s age creates a number of issues, including:

  • An outdated design, which is not in keeping with the local area and does not respond positively to the neighbouring Bethnal Green Gardens Conservation Area.
  • Poor quality internal spaces, with low floor-to-ceiling heights, making the site inappropriate for modern office use.
  • An uninsulated building envelope resulting in poor thermal performance and leading to higher levels of ongoing operational carbon.
  • The ground floor exhibition spaces suffer from a poor layout and do not present an inviting arrival experience for visitors.
  • The surrounding public realm is of a poor quality and is need of investment to encourage people to visit and spend time in the area.
  • Building services and plant equipment are unfit for purpose and have reached the end of their serviceable life.
  • Poor sustainability credentials with limited urban greening on and around the site.

Telford Homes acquired the site in 2017 with the intention of redeveloping it and bringing it into full use. A previous application to provide new homes on the site in buildings of up to 15 storeys was refused in 2020. Telford Living has recently appointed a new design team to begin developing proposals to secure the site’s long-term future.

Consultation and Planning Application

Application submission

We are pleased to share that following engagement with the local community, Telford Living has submitted a planning application to Tower Hamlets Council for the redevelopment of the LEB Building which has now been uploaded to the Council’s planning portal (Planning ref: PA/26/00212/A1).

You can view our submitted documentation below:

Planning Statement
DAS (Design & Access Statement)
Statement of Community Involvement

 

Past events

Thank you to those who joined us on Saturday 18th April for the LEB Spring Festival. It was great to see some many of the local community come out and enjoy the day with us!

If you were unable to attend any of our events last year such as our consultation event or workshop you can download our exhibition boards via the button below.

LEB Exhibition Materials

Contact Us

Thank you for taking the time to view our website for the future of the former LEB building. If you have any questions or further feedback for the team, please get in touch via the details below:

LEB@KandaConsulting.co.uk

020 3900 3676